Beijing Jingneng Clean Energy Co., Limited
0579 · XHKG · Utilities Regulated Electric · China
Beijing Jingneng Clean Energy Co., Limited generates gas-fired power and heat energy, wind power, photovoltaic power, and hydropower in Mainland China and internationally. As of December 31, 2024, it had an installed capacity of 17,437 megawatt (MW), including eight gas-fired cogeneration plants with an installed capacity of 4,775 MW; wind power generation capacity of 6,858 MW; photovoltaic power generation installed capacity of 5,268 MW; and hydropower installed capacity of 310 MW. The company also offers repair and maintenance; investment management; and finance leasing services. In addition, it sells electricity to local grid companies. The company was formerly known as Beijing Jingneng Energy Technology Investment Co., Ltd. and changed its name to Beijing Jingneng Clean Energy Co., Limited in August 2010. The company was founded in 2010 and is based in Beijing, the People' Republic of China. Beijing Jingneng Clean Energy Co., Limited operates as a subsidiary of Beijing Energy Holding Co.,Ltd.
Industry
Utilities Regulated Electric
Utilities sector · China
Coordination
Stories
Structural patterns identified in Beijing Jingneng Clean Energy Co., Limited
Key Metrics
Track Record
Upcoming
Valuation9
Similar Stocks
No similar stocks identified yet.
Supply Chain
Electricity Grid Supply Chain
The electricity grid is shaped by three structural constraints that no other supply chain faces simultaneously: electricity cannot be stored at scale and must be consumed the instant it is generated, power degrades over distance with capacity set by the weakest link in the transmission path, and grid topology was built over a century and cannot be quickly reconfigured.
Nuclear Energy Supply Chain
The nuclear energy supply chain is shaped by three structural constraints that most industries never encounter: regulatory and licensing timelines that stretch beyond a decade before a reactor generates a single watt, a fuel cycle where each step — mining, conversion, enrichment, fabrication — is restricted by both physics and international treaty, and a decommissioning obligation embedded from the moment a plant is approved, binding operators to costs that extend decades beyond the last kilowatt-hour sold.